



- 01Chat we us
We are here to serve you.
We will assist you in person and comfortably through the Internet from 9.30h to 14h and from 15h to 18h.
- 02Call us
Contact
Monday to Friday from 8.30 - 14h / 15h – 18h
Technical emergencies
Monday to Friday from 17 to 21 h
Saturdays 10 to 20 h
- 03Do you prefer that we call you?
Leave us your phone number and we will contact you to help you with whatever you need.
Schedule of attention: 8.30 - 14h / 15h – 18h, monday to friday.
A FASSI CRANE FOR INSTALLATION OF UNDERGROUND PIPES IN CIVIL CONSTRUCTION WORKS
Another Fassi crane for Sistemas de Tubos, a company specialised in the installation of HDPE pipes for pressurized water pipes
Sistemas de Tubos is a company, created in 1995 by professionals with more than 30 years of experience in the world of plastic pipes, with the purpose of offering satisfactory solutions in the field of HDPE pipes from the highest quality standards. With the Fassi F235A.2.26 mid-range crane, the Tarragona company will be able to load and install pipes up to a distance of 17 m horizontally. This crane joins the other Fassi crane trucks that the company already has. It is a crane is an 18 tn / m, with 2 connecting rods, PROLINK system, D850 distributor, flow compensating device (FS), with RCH / RCS radio control and XP device (power reserve).
The work of assembling the truck crane has been completed with the manufacture of a tailor-made body with especially high sides for transporting the tubes. A lot of work for this new crane, we will continue working to deserve the trust of this valued customer.